What can we help find ?
  • Transformer
  • Energy Storage
  • CEEG
  • Grid Side ESS
European style%20Prefabricated%20Substation%20(3)
European style%20Prefabricated%20Substation%20(2)
European style%20Prefabricated%20Substation%20(3)
European style%20Prefabricated%20Substation%20(2)

CEEG 6KV 10KV 35KV European-style Prefabricated Substation

Model: YBW-12/0.4- □KVA
Style: European-style Substation
Rated Voltage: 6KV, 10KV, 35KV
Enclosure Protection Rating: IP54, IP33
Service: Customized Service

1. Comprised of high-voltage switchgear, power transformers, and low-voltage switchgear.

2. Strong system integration, small footprint, cost-effective, easy installation and maintenance.

3. Aesthetic design, highlighting environmental sustainability.

4. Welded from structural steel, excellent mechanical strength.

5. Well-treated surface, high weather resistance.

6. Wide range of options for external materials and colors, offering extensive choices for users.

7. Internal structure available in "H" and "T" shapes, with options for corridor and non-corridor layouts.

1. This substation comprises a high-voltage chamber, dry-type transformer, and low-voltage chamber, arranged in an "H" or "T" shape.

2. The transformer is equipped with a unique air duct, ensuring the normal operation of the voltage-boosting transformer even when the ambient temperature approaches 40°C.

3. The framework of the enclosure is welded using structural steel, featuring built-in hinges that are welded to the structural steel, ensuring the strength of both the enclosure and the doors, and allowing for normal operation of the substation in harsh environmental conditions.

4. The enclosure framework undergoes hot-dip galvanizing and paint treatment, providing resistance to salt spray, humidity, mold, and strong outdoor corrosion resistance.

5. The top cover has a double-layer structure to prevent rainwater ingress and reduce indoor temperature increases due to heat radiation.

6. A separate high-voltage cable compartment is provided for user convenience during wiring.

7. The high-voltage section is equipped with a vacuum load switch-fuse combination device. When a single-phase fuse trips, the load switch disengages under the action of the tripping device, preventing partial-phase operation. The vacuum load switch is equipped with an isolation switch and has a clear disconnect point. High-capacity transformers can also be configured with vacuum circuit breakers.

8. The low-voltage chamber is equipped with low-voltage systems and automated monitoring systems according to user requirements.

9. The substation features comprehensive "five-proof" functions and is easy to operate and maintain.

Our production base covers an area of more than 600 acres (40 hectares) with extensive facilities and a total construction area of 180,000 square meters. We have a professional team of more than 1,000 employees. We have advanced transformer production and testing equipment here to ensure that we provide customers with high-quality power transformer products.

We boast an array of cutting-edge equipment representing a high standard within the industry, including a complete set of shearing machines, fully automated winding machines, robot-operated stacking machines, the Hedrch Vacuum Casting Equipment, vacuum impregnation systems, air cushion transport vehicles, a fully enclosed production workshop with a cleanliness level of 100,000, 20-ton vertical winding machines, 10-ton horizontal winding machines, coal-oil gas phase drying equipment, and a 200-ton overhead crane. We adopt the latest technology and processes to ensure that our products comply with international standards and customer needs.

We have a strong production capacity of 30 million kVA power transformers per year. This means we can cater to all sizes and types of power transformer needs, from small applications to large energy projects. No matter what specifications our customers require, we deliver them on time and support them with high quality and reliability.